ok We use cookies on our website to allow you the best possible service. More information can be found here.
Your location:

Magna Porta

Download as PDF Purchase Images

Identification

Magna Porta
271906

Map

Structure in General

high-rise building
existing [completed]
precast concrete
curtain wall
black white

Usages

commercial office

Facts

  • The tower was built in just 18 weeks with each floor consisting of only 132 separate elements.
  • Instead of being equipped with natural gas, the building was fitted with heat pumps combined with a geothermal installation, resulting in no CO2 emission.

Do you need more information about this building and its related companies?

More Information

Location

Twentepoort West 10-12
Almelo
Overijssel
Netherlands

Technical Data

177.17 ft
14
2006
2007

Involved Companies


Show now
Show now
Show now
Found a mistake?
Related Buildings