Story Bridge

View all 72 images Download as PDF Purchase Images

Identification

Story Bridge
269148

Map

Structure in General

bridge
existing [completed]

Facts

  • 1,500,000 rivets were used to construct the bridge.
  • 41,250 cubic metres of concrete were used in construction.
  • Repainting is done every 7 years using 17,500 litres of paint to cover approximately 105,000 square metres of steel surfaces.
  • Unfortunately four men lost their lives during construction.
  • Construction took one year longer than the planned four years to complete.
  • This bridge is the largest steel bridge designed, fabricated and constructed in Australia by Australians.
  • 39,100 cubic metres of spoil were excavated for the foundations.
  • 1,650 tonnes of reinforcing steel and 12,000 tonnes of structural steel were used in construction.
  • The bridge has guided climbs and is one of only three bridge climbs in the world.

Do you need more information about this building and its related companies?

More Information

Location

1 Story Bridge
Story Bridge
4169
Kangaroo Point
East Side
Brisbane
Queensland
Australia

Technical Data

242.78 ft
242.78 ft
3,517.06 ft
78.74 ft
1935
1940