Sellwood Bridge

Download as PDF Purchase Images

Identification

Sellwood Bridge
247373

Map

Structure in General

bridge
existing [completed]
green

Facts

  • In late 2007, the county-sponsored Bridge Type Working Group recommended six replacement bridge options for the existing structure; Box Girder, Delta Frame, Deck Arch, Extradosed, Through Arch, and Cable-Stayed.
  • The county-sponsored group is comprised of; Bruce Johnson, Gil Kelley, Robert Perron, Scott Thayer, Paddy Tillett, and Sharon Wood all of whom are local bridge experts.
  • January 19, 2013, it took 14 hours to move original bridge truss which will be eventually replaced
  • The main span of the continuous deck truss bridge is 300 feet.
  • Named after the 1893 annexed town.

Do you need more information about this building and its related companies?

More Information

Location

Sellwood Bridge
Sellwood-Moreland
Southeast
Portland
Oregon
U.S.A.

Technical Data

75.00 ft
28.00 ft
1925
$541,000

Involved Companies


Show now
Show now