ok We use cookies on our website to allow you the best possible service. More information can be found here.
Your location:

BIL Control Tower

View all 9 images Download as PDF Purchase Images

Identification

BIL Control Tower
Billings Logan International Airport ATCT, BIL Air Traffic Control Tower
216725

Map

Structure in General

airport tower
existing [completed]
precast concrete
modernism

Usages

air traffic control radar transmission

Facts

  • This tower is replacing a 40-year old control tower.
  • The tower is scheduled to be completed in early 2005 and fully operational by 2006.
  • The tower is scheduled to be on-line and fully operational on September 18, 2006.
  • The new tower is 30 feet taller than the old tower.

Do you need more information about this building and its related companies?

More Information

Location

1901 Terminal Circle
59105
BIL-Airport
North Elevation
Billings
Montana
U.S.A.

Technical Data

120.00 ft
1
2003
2006
2
$7,522,900

Involved Companies


Show now
Found a mistake?
Related Buildings