ok We use cookies on our website to allow you the best possible service. More information can be found here.
Your location:

Vue on Main

Download as PDF

Identification

Vue on Main
Gayoso Place
186840

Map

Structure in General

high-rise building
unbuilt [cancelled]
concrete
postmodernism

Usages

rental apartments
mercantile parking

Facts

  • The Vue on Main (formerly Gayoso Place) was selected in May 2003 by the Center City Commission to redevelop the block between Union and Gayoso Avenues on South Main Street, part of which has been vacant since a 1997 fire.
  • Originally a 21-level apartment building, it beat a competing 10-level office building proposed by Washington DC-based Akridge Real Estate Services.
  • Demolition of the existing buildings on the site began in late January 2004 and was complete by March 21, 2004.
  • The developers hired new architects in early 2004, expanding the tower to 28 floors and changing from steel to concrete-framed construction.
  • The Vue on Main was canceled by its developers in summer 2006.
  • The excavated site became known as the "Hole on Main."
  • After a new round of competing proposals, Barboro Flats was ultimately selected in 2007 as the winning proposal to develop the site.

Do you need more information about this building and its related companies?

More Information

Location

100-114 South Main Street
100 Gayoso Avenue
100-114 South Main Street
38103
Memphis
Tennessee
U.S.A.

Technical Data

296.59 ft
296.59 ft
296.59 ft
279.07 ft
9.51 ft
28
1
2004
420
$42,000,000

Involved Companies

EDI International

Show now
Show now
Found a mistake?
Related Buildings