De Bolder

View all 8 images Download as PDF Purchase Images

Identification

De Bolder
169873

Map

Structure in General

high-rise building
existing [completed]
steel

Usages

commercial office

Facts

  • The building was constructed inside the factory hall of Grootint in Zwijndrecht.
  • In a three day operation, the 2500 ton building was moved over water to its ultimate location in Schiedam.

Do you need more information about this building and its related companies?

More Information

Location

Karel Doormanweg 47
Schiedam
Zuid-Holland
Netherlands

Technical Data

139.44 ft
139.44 ft
139.44 ft
10
2001