Facts

  • A record breaking 13-hour concrete pour, the longest single concrete pour in Durban’s history and one of the largest in South Africa, was performed on this contract.
  • This building includes 27 889 m² of A-grade office space, 2 348m² of ground floor shops, and an adjacent four-storey parking garage.
  • Through a process of pre-qualification and tender, 3G Construction, a joint venture between Group Five Stevenson and Grinaker Building, were appointed.
  • Mature 15m high palms were transported and planted in West Street at the entrance to the building.
  • The site bounded by West, Smith and Gardiner Streets required the demolition of existing buildings with one being dramatically imploded.
  • This is the last major high-rise office block to be built in Durban.
  • The project was awarded first place for contracts in excess of US$12 million in the Building Industries Federation in South Africa’s (BIFSA’s) national safety competition. It also achieved a Building Industry five-star grading for safety on site.

Do you need more information about this building and its related companies?

More Information

Location

303 West Street Mall
303 West Street
4001
Durban
KwaZulu-Natal
South Africa

Technical Data

449.48 ft
429.00 ft
33
5
1993
1995
12
406
$29,000,000

Involved Companies


Show now
Show now
Show now
Found a mistake?
Related Buildings