Contact   |   Help
 
Home World Map Buildings Companies Images Products PROPERTY LISTINGS
 Your position: World / North America / Canada / Toronto
Toronto (start page)
Toronto

Toronto

Construction Status

The aim of this section is to provide detailed photo documentation of skyscrapers in Toronto during their construction phase. Our editors document the construction process of high-rise buildings, which is only available in this form on Emporis.

1000 Mount Pleasant
under construction [frame assembly] 1000 Mount Pleasant 
Files: 4
 
100 Yorkville
under construction [topped out] 100 Yorkville 
Files: 47
 
101 St. Clair
unbuilt [cancelled] 101 St. Clair 
Files: 2
 
105 Harrison Garden
under construction [frame assembly] 105 Harrison Garden 
Files: 5
 
10 Navy
existing [completed] 10 Navy 
Files: 10
 
130 Bloor Street West
existing [completed] 130 Bloor Street West 
Files: 4
 
18 Yonge
existing [completed] 18 Yonge 
Files: 42
 
18 York Street
under construction [frame assembly] 18 York Street 
Files: 28
 
18 Yorkville
existing [completed] 18 Yorkville 
Files: 14
 
1 King West
existing [completed] 1 King West 
Files: 80
 
20 Gothic
existing [completed] 20 Gothic 
Files: 24
 
21 Hillcrest
existing [completed] 21 Hillcrest 
Files: 21
 
22 Wellesley
existing [completed] 22 Wellesley 
Files: 11
 
263 Wellington
existing [completed] 263 Wellington 
Files: 12
 
294 Richmond Street East
existing [completed] 294 Richmond Street East 
Files: 16
 
35 Mariner
existing [completed] 35 Mariner 
Files: 37
 
360° @ the City Centre
existing [completed] 360° @ the City Centre 
Files: 170
 
3 Navy
existing [completed] 3 Navy 
Files: 6
 
455 Adelaide West
existing [completed] 455 Adelaide West 
Files: 22
 
45 Lisgar
under construction [foundation work] 45 Lisgar 
Files: 1
 
501 Adelaide
existing [completed] 501 Adelaide 
Files: 68
 
52 Sumach
under construction [topped out] 52 Sumach 
Files: 10
 
549 King East
under construction [frame assembly] 549 King East 
Files: 11
 
550 Wellington, center tower
under construction [topped out] 550 Wellington, center tower 
Files: 21
 
550 Wellington, East tower
under construction [topped out] 550 Wellington, East tower 
Files: 15
 
550 Wellington, West tower
under construction [topped out] 550 Wellington, West tower 
Files: 86
 
55 & 65 Harbour Square
existing [completed] 55 & 65 Harbour Square 
Files: 1
 
569 King East
under construction [topped out] 569 King East 
Files: 10
 
5 Mariner
existing [completed] 5 Mariner 
Files: 14
 
60 Richmond Street East
under construction [topped out] 60 Richmond Street East 
Files: 20
 
76 Shuter
existing [completed] 76 Shuter 
Files: 6
 
77 Charles
under construction [foundation work] 77 Charles 
Files: 2
 
80 Yorkville
existing [completed] 80 Yorkville 
Files: 53
 
83 Redpath
under construction [frame assembly] 83 Redpath 
Files: 11
 
85 Bloor
existing [completed] 85 Bloor 
Files: 4
 
900 Mount Pleasant
existing [completed] 900 Mount Pleasant 
Files: 8
 
92 Carlton
under construction [frame assembly] 92 Carlton 
Files: 11
 
9T6
existing [completed] 9T6 
Files: 30
 
Accolade
existing [completed] Accolade 
Files: 34
 
Accolade Del Manor
existing [completed] Accolade Del Manor 
Files: 11
 
Aegon Place
existing [completed] Aegon Place 
Files: 8
 
aloft Toronto Downtown
unbuilt [cancelled] aloft Toronto Downtown 
Files: 18
 
Altitude
under construction [foundation work] Altitude 
Files: 3
 
Amica at Bayview Gardens
under construction [topped out] Amica at Bayview Gardens 
Files: 11
 
Annex Terraces
existing [completed] Annex Terraces 
Files: 22
 
ARC
existing [completed] ARC 
Files: 32
 
Aria
under construction [frame assembly] Aria 
Files: 9
 
Aria 2
under construction [frame assembly] Aria 2 
Files: 9
 
Atlantis
existing [completed] Atlantis 
Files: 8
 
Avondale Lofts
existing [completed] Avondale Lofts 
Files: 18
 
Avonshire
under construction [foundation work] Avonshire 
Files: 5
 
Avonshire 2
under construction [foundation work] Avonshire 2 
Files: 4
 
Battery Park
existing [completed] Battery Park 
Files: 30
 
Bay Adelaide East
planned [approved] Bay Adelaide East 
Files: 7
 
Bay Adelaide West
existing [completed] Bay Adelaide West 
Files: 250
 
Bay Club
existing [completed] Bay Club 
Files: 10
 
Beyond the Sea, North tower
under construction [foundation work] Beyond the Sea, North tower 
Files: 6
 
Beyond the Sea, South tower
under construction [foundation work] Beyond the Sea, South tower 
Files: 7
 
Bliss
under construction [frame assembly] Bliss 
Files: 22
 
Bloor Walk
existing [completed] Bloor Walk 
Files: 22
 
BMO Field
existing [completed] BMO Field 
Files: 5
 
Bohemian Embassy
under construction [frame assembly] Bohemian Embassy 
Files: 37
 
Bohemian Embassy Lofts
under construction [frame assembly] Bohemian Embassy Lofts 
Files: 28
 
Boutique
under construction [topped out] Boutique 
Files: 127
 
Boutique 2
under construction [frame assembly] Boutique 2 
Files: 57
 
Bridge
under construction [frame assembly] Bridge 
Files: 13
 
Broadway I
existing [completed] Broadway I 
Files: 2
 
Burano
under construction [foundation work] Burano 
Files: 33
 
Burnview Apartments
existing [completed] Burnview Apartments 
Files: 2
 
California Condos
planned [site preparation] California Condos 
Files: 2
 
Campus Common Phase I
existing [completed] Campus Common Phase I 
Files: 3
 
Campus Common Phase II
existing [completed] Campus Common Phase II 
Files: 5
 
Canada Life Tower
existing [completed] Canada Life Tower 
Files: 10
 
Carrington on the Park
existing [completed] Carrington on the Park 
Files: 6
 
CASA
under construction [topped out] CASA 
Files: 158
 
C Condos
existing [completed] C Condos 
Files: 34
 
Centro
under construction [frame assembly] Centro 
Files: 7
 
Centro 2
under construction [frame assembly] Centro 2 
Files: 9
 
Charlie Condos
under construction [foundation work] Charlie Condos 
Files: 2
 
Churchill Park
under construction [foundation work] Churchill Park 
Files: 6
 
Clear Spirit
under construction [foundation work] Clear Spirit 
Files: 3
 
Commerce Court North
existing [completed] Commerce Court North 
Files: 1
 
Corus Entertainment Centre
under construction [topped out] Corus Entertainment Centre 
Files: 28
 
Cosmopolitan Toronto Hotel
existing [completed] Cosmopolitan Toronto Hotel 
Files: 6
 
Crystal Blu
under construction [frame assembly] Crystal Blu 
Files: 103
 
Cube Lofts
under construction [foundation work] Cube Lofts 
Files: 8
 
Delmanor Northtown
existing [completed] Delmanor Northtown 
Files: 12
 
Dia
existing [completed] Dia 
Files: 6
 
Discovery A
under construction [frame assembly] Discovery A 
Files: 6
 
Discovery B
under construction [frame assembly] Discovery B 
Files: 6
 
Discovery II C
under construction [foundation work] Discovery II C 
Files: 3
 
Discovery II D
under construction [foundation work] Discovery II D 
Files: 3
 
Discovery II E
under construction [foundation work] Discovery II E 
Files: 3
 
DNA
existing [completed] DNA 
Files: 20
 
DNA 2
existing [completed] DNA 2 
Files: 1
 
East
under construction [topped out] East 
Files: 63
 
Edge Lofts
existing [completed] Edge Lofts 
Files: 29
 
Element
existing [completed] Element 
Files: 37
 
Ellipse, East tower
existing [completed] Ellipse, East tower 
Files: 16
 
Ellipse, West tower
existing [completed] Ellipse, West tower 
Files: 18
 
Empire Condominium
existing [completed] Empire Condominium 
Files: 5
 
Empire Place II
under construction [frame assembly] Empire Place II 
Files: 2
 
Encore
existing [completed] Encore 
Files: 18
 
eq1
existing [completed] eq1 
Files: 34
 
eq2
existing [completed] eq2 
Files: 20
 
Equinox
existing [completed] Equinox 
Files: 172
 
Equinox 2
existing [completed] Equinox 2 
Files: 120
 
Explorer, West tower
existing [completed] Explorer, West tower 
Files: 1
 
Festival Tower
under construction [frame assembly] Festival Tower 
Files: 168
 
Fifty Spadina
existing [completed] Fifty Spadina 
Files: 4
 
Flatiron Lofts
planned [site preparation] Flatiron Lofts 
Files: 1
 
Forest Vista
existing [completed] Forest Vista 
Files: 5
 
Fountains of Edenbridge
existing [completed] Fountains of Edenbridge 
Files: 2
 
Four Seasons Centre for the Performing Arts
existing [completed] Four Seasons Centre for the Performing Arts 
Files: 3
 
Four Seasons Private Residences, East tower
under construction [frame assembly] Four Seasons Private Residences, East tower 
Files: 33
 
Four Seasons Private Residences, West tower
under construction [frame assembly] Four Seasons Private Residences, West tower 
Files: 50
 
Gallery Condominiums
under construction [frame assembly] Gallery Condominiums 
Files: 9
 
Gläs Condominium
existing [completed] Gläs Condominium 
Files: 97
 
Grand Triomphe
existing [completed] Grand Triomphe 
Files: 1
 
Grand Triomphe 2
existing [completed] Grand Triomphe 2 
Files: 33
 
Hearthstone by the Bay
existing [completed] Hearthstone by the Bay 
Files: 35
 
Highpark Condominiums
existing [completed] Highpark Condominiums 
Files: 4
 
Hilton Garden Inn
existing [completed] Hilton Garden Inn 
Files: 81
 
iLoft
under construction [frame assembly] iLoft 
Files: 20
 
Infinity
existing [completed] Infinity 
Files: 146
 
Infinity²
existing [completed] Infinity² 
Files: 75
 
James Cooper Mansion
under construction [frame assembly] James Cooper Mansion 
Files: 25
 
Jazz
existing [completed] Jazz 
Files: 8
 
King's Court
existing [completed] King's Court 
Files: 4
 
Kingswood on Bloor
existing [completed] Kingswood on Bloor 
Files: 2
 
King West Condos 3
planned [site preparation] King West Condos 3 
Files: 5
 
Leslie L. Dan Pharmacy Building
existing [completed] Leslie L. Dan Pharmacy Building 
Files: 1
 
Liberty Tower
under construction [frame assembly] Liberty Tower 
Files: 29
 
Li Ka Shing Knowledge Institute
under construction [frame assembly] Li Ka Shing Knowledge Institute 
Files: 27
 
London on the Esplanade, East tower
existing [completed] London on the Esplanade, East tower 
Files: 42
 
London on the Esplanade, West tower
existing [completed] London on the Esplanade, West tower 
Files: 114
 
Lotus
existing [completed] Lotus 
Files: 36
 
Lumiere
under construction [frame assembly] Lumiere 
Files: 92
 
Luna
under construction [topped out] Luna 
Files: 71
 
Luna Vista
under construction [topped out] Luna Vista 
Files: 102
 
Luxe, North tower
under construction [topped out] Luxe, North tower 
Files: 20
 
Luxe, South tower
existing [completed] Luxe, South tower 
Files: 26
 
M1
under construction [topped out] M1 
Files: 8
 
M2
under construction [frame assembly] M2 
Files: 4
 
M5V
under construction [frame assembly] M5V 
Files: 29
 
Madison Avenue Lofts
existing [completed] Madison Avenue Lofts 
Files: 46
 
Malibu
existing [completed] Malibu 
Files: 56
 
Mansions of Humberwood 2
existing [completed] Mansions of Humberwood 2 
Files: 2
 
Maple Leaf Square, North tower
under construction [topped out] Maple Leaf Square, North tower New
Files: 144
 
Maple Leaf Square, South tower
under construction [topped out] Maple Leaf Square, South tower New
Files: 141
 
Market Wharf
under construction [foundation work] Market Wharf 
Files: 2
 
Marquis at Northtown
existing [completed] Marquis at Northtown 
Files: 1
 
Marriott Residence Inn
existing [completed] Marriott Residence Inn 
Files: 23
 
MaRS Discovery Centre East Tower
existing [completed] MaRS Discovery Centre East Tower 
Files: 15
 
MaRS Discovery Centre West Tower
under construction [on hold] MaRS Discovery Centre West Tower 
Files: 17
 
Merci
under construction [topped out] Merci 
Files: 14
 
Meridian
existing [completed] Meridian 
Files: 52
 
Meridian 2
existing [completed] Meridian 2 
Files: 26
 
Minto Skyy
under construction [topped out] Minto Skyy 
Files: 20
 
Mona Lisa Residences
under construction [frame assembly] Mona Lisa Residences 
Files: 10
 
Mondeo Springs Phase 1
existing [completed] Mondeo Springs Phase 1 
Files: 2
 
Mondeo Springs Phase 2
existing [completed] Mondeo Springs Phase 2 
Files: 46
 
Montage
existing [completed] Montage 
Files: 98
 
Mosaic
existing [completed] Mosaic 
Files: 10
 
Mozo
existing [completed] Mozo 
Files: 19
 
Murano, North Tower
existing [completed] Murano, North Tower 
Files: 123
 
Murano, South Tower
existing [completed] Murano, South Tower 
Files: 133
 
Museum House
under construction [foundation work] Museum House 
Files: 13
 
N˚ 155 Cumberland Street
under construction [topped out] N˚ 155 Cumberland Street 
Files: 29
 
N1/N2
existing [completed] N1/N2 
Files: 73
 
Nautilus
under construction [foundation work] Nautilus 
Files: 19
 
Neo
existing [completed] Neo 
Files: 74
 
Neptune
under construction [frame assembly] Neptune 
Files: 88
 
Neptune 2
under construction [foundation work] Neptune 2 
Files: 9
 
Network Lofts
existing [under renovation] Network Lofts 
Files: 6
 
Nuvo
existing [completed] Nuvo 
Files: 6
 
Nuvo 2
existing [completed] Nuvo 2 
Files: 19
 
NXT
under construction [frame assembly] NXT 
Files: 22
 
NXT 2
under construction [on hold] NXT 2 
Files: 10
 
Olympic Spirit Toronto
existing [completed] Olympic Spirit Toronto 
Files: 1
 
One Bedford
under construction [frame assembly] One Bedford 
Files: 64
 
One City Hall
existing [completed] One City Hall 
Files: 11
 
OneCole 4
under construction [topped out] OneCole 4 
Files: 10
 
OneCole North
existing [completed] OneCole North 
Files: 19
 
OneCole NorthWest
under construction [topped out] OneCole NorthWest 
Files: 1
 
OneCole South
existing [completed] OneCole South 
Files: 18
 
OneCole West
existing [completed] OneCole West 
Files: 10
 
One Sherway Tower 1
existing [completed] One Sherway Tower 1 
Files: 13
 
One Sherway Tower 2
existing [completed] One Sherway Tower 2 
Files: 11
 
One St. Thomas
existing [completed] One St. Thomas 
Files: 27
 
Ontario College of Art & Design
existing [completed] Ontario College of Art & Design 
Files: 5
 
Opus
existing [completed] Opus 
Files: 12
 
Palais at Port Royal Place
under construction [foundation work] Palais at Port Royal Place 
Files: 1
 
Panache
existing [completed] Panache 
Files: 12
 
Panorama
under construction [topped out] Panorama 
Files: 95
 
Pantages Tower
existing [completed] Pantages Tower 
Files: 18
 
Parade 2, East tower
planned [site preparation] Parade 2, East tower 
Files: 8
 
Parade 2 Podium
planned [site preparation] Parade 2 Podium 
Files: 9
 
Parade 2, West tower
planned [site preparation] Parade 2, West tower 
Files: 8
 
Parade, East tower
under construction [topped out] Parade, East tower 
Files: 25
 
Parade podium
under construction [frame assembly] Parade podium 
Files: 27
 
Parade, West tower
under construction [frame assembly] Parade, West tower 
Files: 44
 
Park Lake, East tower
under construction [topped out] Park Lake, East tower 
Files: 21
 
Park Lake, West tower
under construction [topped out] Park Lake, West tower 
Files: 28
 
Pearl
under construction [frame assembly] Pearl 
Files: 5
 
Pinnacle Centre Tower A
existing [completed] Pinnacle Centre Tower A 
Files: 63
 
Pinnacle Centre Tower B
existing [completed] Pinnacle Centre Tower B 
Files: 32
 
Platinum
existing [completed] Platinum 
Files: 9
 
Platinum XO
existing [completed] Platinum XO 
Files: 24
 
Plaza Royale
under construction [topped out] Plaza Royale 
Files: 1
 
Port Royal Place 2
existing [completed] Port Royal Place 2 
Files: 1
 
Princess Place IV
existing [completed] Princess Place IV 
Files: 2
 
Pulse
existing [completed] Pulse 
Files: 24
 
Pulse 2
existing [completed] Pulse 2 
Files: 16
 
Pure Spirit
existing [completed] Pure Spirit 
Files: 34
 
Quantum
existing [completed] Quantum 
Files: 12
 
Quantum 2
existing [completed] Quantum 2 
Files: 29
 
Quay West at Tip Top
under construction [frame assembly] Quay West at Tip Top 
Files: 67
 
Queen and Portland
under construction [foundation work] Queen and Portland 
Files: 9
 
Radiance @ MintoGardens
existing [completed] Radiance @ MintoGardens 
Files: 1
 
Radio City
existing [completed] Radio City 
Files: 7
 
Radio City 2
existing [completed] Radio City 2 
Files: 10
 
RBC Centre
existing [completed] RBC Centre 
Files: 232
 
R Condos
existing [completed] R Condos 
Files: 24
 
Red
unbuilt [cancelled] Red 
Files: 1
 
Red Hot Condos 2
planned [approved] Red Hot Condos 2 
Files: 4
 
Residences of College Park
existing [completed] Residences of College Park 
Files: 80
 
Residences of College Park 2
existing [completed] Residences of College Park 2 
Files: 48
 
Reve
under construction [on hold] Reve 
Files: 16
 
Rezen
existing [completed] Rezen 
Files: 26
 
Royal Ontario Museum
existing [completed] Royal Ontario Museum 
Files: 9
 
Royal York Grand
existing [completed] Royal York Grand 
Files: 8
 
Sandman Hotel Toronto
existing [completed] Sandman Hotel Toronto 
Files: 6
 
Schoolhouse
under construction [topped out] Schoolhouse 
Files: 5
 
Serrano
existing [completed] Serrano 
Files: 3
 
Seventy5 Portland
under construction [topped out] Seventy5 Portland 
Files: 52
 
Shangri-La Toronto
under construction [foundation work] Shangri-La Toronto 
Files: 95
 
Sixty Loft
existing [completed] Sixty Loft 
Files: 17
 
Skymark 2 at Avondale
existing [completed] Skymark 2 at Avondale 
Files: 3
 
Skymark at Avondale
existing [completed] Skymark at Avondale 
Files: 7
 
Skyscape
existing [completed] Skyscape 
Files: 21
 
Soho Metropolitan Hotel & Condominiums
existing [completed] Soho Metropolitan Hotel & Condominiums 
Files: 12
 
Solara Condominiums
existing [completed] Solara Condominiums 
Files: 1
 
Solaris
under construction [frame assembly] Solaris 
Files: 4
 
Solaris 2
under construction [frame assembly] Solaris 2 
Files: 4
 
South Beach Condos + Lofts, West tower
under construction [foundation work] South Beach Condos + Lofts, West tower 
Files: 1
 
Space
existing [completed] Space 
Files: 12
 
Spectrum 2
existing [completed] Spectrum 2 
Files: 2
 
SPIRE
existing [completed] SPIRE 
Files: 48
 
Spring @ Minto Gardens
under construction [frame assembly] Spring @ Minto Gardens 
Files: 9
 
Star Tower
under construction [foundation work] Star Tower 
Files: 7
 
St. Gabriel Terraces
existing [completed] St. Gabriel Terraces 
Files: 16
 
St. Gabriel Village North Tower
existing [completed] St. Gabriel Village North Tower 
Files: 10
 
St. Gabriel Village South Tower
existing [completed] St. Gabriel Village South Tower 
Files: 10
 
Success Tower
existing [completed] Success Tower 
Files: 178
 
Success Tower 2
under construction [on hold] Success Tower 2 
Files: 32
 
Tapestry
existing [completed] Tapestry 
Files: 2
 
Telus Tower
existing [completed] Telus Tower 
Files: 196
 
Templar Hotel
under construction [topped out] Templar Hotel 
Files: 65
 
Terrence Donnelly Centre for Cellular and Biomolecular Research
existing [completed] Terrence Donnelly Centre for Cellular and Biomolecular Research 
Files: 7
 
The 500
under construction [topped out] The 500 
Files: 73
 
The 500 Lofts
under construction [topped out] The 500 Lofts 
Files: 21
 
The 88 on Broadway
existing [completed] The 88 on Broadway 
Files: 14
 
The Avenue
under construction [topped out] The Avenue 
Files: 25
 
The Bayview
under construction [frame assembly] The Bayview 
Files: 17
 
The Bloor Street Neighbourhood
under construction [topped out] The Bloor Street Neighbourhood 
Files: 141
 
The Carlyle 2
existing [completed] The Carlyle 2 
Files: 1
 
The Continental
existing [completed] The Continental 
Files: 1
 
The Dundfield
existing [completed] The Dundfield 
Files: 16
 
The Essex 1
existing [completed] The Essex 1 
Files: 2
 
The Florian
under construction [foundation work] The Florian 
Files: 6
 
The Forest Hill
under construction [topped out] The Forest Hill 
Files: 20
 
The Gallery
existing [completed] The Gallery 
Files: 25
 
The Glasshouse
existing [completed] The Glasshouse 
Files: 42
 
The Hudson
existing [completed] The Hudson 
Files: 13
 
The Icon 2
existing [completed] The Icon 2 
Files: 3
 
The James Club
under construction [frame assembly] The James Club 
Files: 4
 
The Legends @ Tam O'Shanter
existing [completed] The Legends @ Tam O'Shanter 
Files: 2
 
The L Tower
planned [site preparation] The L Tower 
Files: 1
 
The Majestic II
existing [completed] The Majestic II 
Files: 3
 
The Met
existing [completed] The Met 
Files: 22
 
The Modern
under construction [foundation work] The Modern 
Files: 2
 
The Printing Factory Lofts
under construction [topped out] The Printing Factory Lofts 
Files: 11
 
The Promenade
existing [completed] The Promenade 
Files: 13
 
The Regency
existing [completed] The Regency 
Files: 26
 
The Republic, North tower
under construction [frame assembly] The Republic, North tower 
Files: 14
 
The Republic, South tower
under construction [frame assembly] The Republic, South tower 
Files: 13
 
The Residence of Avondale, North tower
existing [completed] The Residence of Avondale, North tower 
Files: 4
 
The Residences at the Ritz-Carlton, Toronto
under construction [frame assembly] The Residences at the Ritz-Carlton, Toronto New
Files: 176
 
The Richmond
existing [completed] The Richmond 
Files: 1
 
The Riviera, West tower
existing [completed] The Riviera, West tower 
Files: 4
 
The Rockefeller
existing [completed] The Rockefeller 
Files: 3
 
The Rosewood, North tower
existing [completed] The Rosewood, North tower 
Files: 27
 
The Rosewood, South tower
under construction [topped out] The Rosewood, South tower 
Files: 20
 
The Russell Hill
under construction [topped out] The Russell Hill 
Files: 8
 
The Star of Downtown
existing [completed] The Star of Downtown 
Files: 12
 
The St. Joseph
existing [completed] The St. Joseph 
Files: 4
 
The Terrace at Christie Gardens
existing [completed] The Terrace at Christie Gardens 
Files: 4
 
The Uptown
under construction [frame assembly] The Uptown 
Files: 94
 
The Village
under construction [frame assembly] The Village 
Files: 1
 
Tides
existing [completed] Tides 
Files: 4
 
Tip Top Lofts
existing [completed] Tip Top Lofts 
Files: 14
 
Toronto Life Square
existing [completed] Toronto Life Square 
Files: 6
 
Toy Factory Lofts
existing [completed] Toy Factory Lofts 
Files: 6
 
Triomphe 2
existing [completed] Triomphe 2 
Files: 1
 
Trump International Hotel & Tower Toronto
under construction [frame assembly] Trump International Hotel & Tower Toronto New
Files: 119
 
Ultima
existing [completed] Ultima 
Files: 16
 
University Plaza
existing [completed] University Plaza 
Files: 8
 
Verve
existing [completed] Verve 
Files: 38
 
Verve Lofts
existing [completed] Verve Lofts 
Files: 5
 
Vibe
under construction [frame assembly] Vibe 
Files: 86
 
Victory Condominiums
under construction [foundation work] Victory Condominiums 
Files: 8
 
Vivere
under construction [frame assembly] Vivere 
Files: 10
 
Voyager 1
existing [completed] Voyager 1 
Files: 7
 
Voyager 2
existing [completed] Voyager 2 
Files: 4
 
VÜ, North tower
existing [completed] VÜ, North tower 
Files: 56
 
VÜ, South tower
under construction [topped out] VÜ, South tower 
Files: 105
 
Waterclub, East tower
existing [completed] Waterclub, East tower 
Files: 30
 
Waterclub, South tower
existing [completed] Waterclub, South tower 
Files: 30
 
Waterclub, West tower
existing [completed] Waterclub, West tower 
Files: 24
 
Waterford East
existing [completed] Waterford East 
Files: 1
 
Waterford South
existing [completed] Waterford South 
Files: 2
 
Waterford West
existing [completed] Waterford West 
Files: 1
 
WaterParkCity
existing [completed] WaterParkCity 
Files: 31
 
Wellesley Central Residences
existing [completed] Wellesley Central Residences 
Files: 16
 
West Harbour City
under construction [topped out] West Harbour City New
Files: 133
 
West Harbour City 2
under construction [frame assembly] West Harbour City 2 
Files: 40
 
West Harbour City 3
planned [approved] West Harbour City 3 
Files: 7
 
West One
existing [completed] West One 
Files: 118
 
Westside Gallery Lofts
under construction [on hold] Westside Gallery Lofts 
Files: 5
 
Westside Lofts Tower
under construction [frame assembly] Westside Lofts Tower 
Files: 9
 
Windermere by the Lake
existing [completed] Windermere by the Lake 
Files: 41
 
Woodsworth College Student Residence
existing [completed] Woodsworth College Student Residence 
Files: 20
 
WorkLofts
planned [site preparation] WorkLofts 
Files: 1
 
X Condominium
under construction [frame assembly] X Condominium 
Files: 208
 
YWCA Elm Centre
under construction [foundation work] YWCA Elm Centre 
Files: 9
 
Zed
existing [completed] Zed 
Files: 3
 
Zip
existing [completed] Zip 
Files: 101
 
Click here to view the construction status for other cities.
Emporis in English | Emporis auf Deutsch | Emporis en français | Emporis em Português | Emporis en Español