ok We use cookies on our website to allow you the best possible service. More information can be found here.
Your location:

Mirabella Portland

Identification

Mirabella Portland
Block 31, Continuing Care Retirement Community (CCRC), The Mirabella South Waterfront
292619

Map

Structure in General

high-rise building
existing [completed]

Usages

senior living

Facts

  • Mirabella is registered with the certification goal of LEED Platinum. Sustainable design strategies include reclaiming a brownfield site; solar hot water; handling of storm water runoff on site through a green roof and bio-swales; controlling the amount of needed irrigation by using native plants; proper building orientation; a water source heat pump and heat recovery system; stacked valet parking, which reduced the size of the parking garage by 2/3 of what a conventional garage would require; dual flush toilets; and locally sourced materials.

Do you need more information about this building and its related companies?

More Information

Location

SW River Parkway,  SW Curry Street,  SW Bond Avenue
3550 SW Bond Avenue
Corbett/Terwilliger
Southwest
Portland
Oregon
U.S.A.

Technical Data

325.00 ft
30
2008
2010
244

Involved Companies


Ankrom Moisan Architects, Inc.
developer, general contractor, landscape architect, owner, property management
Found a mistake?