ok We use cookies on our website to allow you the best possible service. More information can be found here.
Your location:

Mercury City

Identification

Mercury City
Mercury City Tower
Mercury Office Tower
291262

Map

Structure in General

skyscraper
existing [completed]
concrete
glass
curtain wall
structural expressionism

Usages

residential office
shop(s) parking

Facts

  • The 53rd floor (230 meters) was completed in May 2011.
  • Combined, the inclined surfaces of the building's exterior are equivalent in area to a soccer field.
  • The 67th floor was completed in February 2012.
  • Of the 20 passenger lifts, 10 of them are TWIN system - where two elevator cabs operate independently one above the other in the same shaft.
  • The tallest building in Europe features a total of 29 elevators, two of them are high-speed elevators travelling at a maximum speed of 7 m/s.
  • Architect Frank Williams claims this is the first environmentally friendly building in Moscow. It is designed to use less water and electricity by collecting melting water and providing 75% workspace with daylight. 10% of the construction material came from a 300 kilometer radius of the construction site.
  • Of the 29 elevators, 20 are passenger elevators and 9 are service elevators.

Do you need more information about this building and its related companies?

More Information

Location

1-y Krasnogvardeyskiy proyezd, 15
Presnensky
Central
Moscow
City of Moscow
Russia

Technical Data

1,111.61 ft
1,111.61 ft
1,111.61 ft
75
5
2006
2013
29
$1,000,000,000

Involved Companies


Show now
Show now
Show now
Show now
Show now
Show now
Found a mistake?
Related Buildings
Avenue 77A
Moscow
Russia
existing [completed]
Skylight 1
Moscow
Russia
existing [completed]
OKO Office Tower
Moscow
Russia
existing [completed]
Red Gate Square
Moscow
Russia
existing [completed]
Leninsky Prospekt 116-1
Moscow
Russia
existing [completed]