Your location:

Compuware World Headquarters

Identification

Compuware World Headquarters
One Campus Martius, Kern Block
100476

Map

Structure in General

high-rise building
existing [completed]
steel
concrete
glass
granite
limestone
curtain wall
postmodernism

Usages

commercial office
shop(s) service branch(es) restaurant fitness center parking

Facts

  • The building has 280,000 square feet of glass.
  • Phase II of this building (when demand warrants its construction) will be a 325,000 square feet addition to the back of the building to fill in the missing wedge.
  • The building's water feature was designed by WET Design, the same people who designed the fountains at Bellagio and the Winter Olympic cauldron. It features fifteen glass "kites" and, at more than 14 stories tall, represents the largest indoor, hanging water feature in the world.
  • The entire 14th floor includes an outdoor observation deck around the interior.
  • A Hard Rock Cafe was opened in late 2003 on the dining level.
  • The top two floors, (15 and 16) house mechanical services exclusively.
  • Like numerous buildings in the Western world, this one does not include a labelled 13th floor.

Do you need more information about this building and its related companies?

More Information

Location

1 Campus Martius
48226
Downtown
Detroit
Michigan
U.S.A.

Technical Data

232.00 ft
232.00 ft
228.00 ft
16
2
2000
2003
24
$350,000,000

Involved Companies


Hamilton Anderson Associates

Rossetti Associates
MEP engineering, client, crane supplier (construction), developer, electrical engineering, elevator finishing, elevator supplier, facade maintenance system supplier, facade supplier, fire protection engineering, floor installation, general contractor, mechanical systems installation, owner, project management, property management, tenant, water landscape designer
Found a mistake?